MOTOROLA

Client: AIRPORT CITY DEVELOPMENT CO Location: AIRPORT CITY, ISRAEL Date: Status: COMPLETED

This complex of 80,000 sq.m. was originally designed specifically to fit the program of Motorola for its headquaters in Israel. The large building is composed of four wings interconnected by a high central atrium. Open-air courts between each wing serve as green recreation areas, Each wing has 8,000 to 12,000  sq.m. office and r+d spaces in 6 floors,  all above 40,000 sq.m. underground and technical laboratory areas, parking and a central power plant.

In retrospect, this design allowed also an efficient Exit Srategy when the original program shrinked and most wings have been occupied by othe users.

close slider

MOTOROLA

Client: AIRPORT CITY DEVELOPMENT CO Location: AIRPORT CITY, ISRAEL Date: Status: COMPLETED

This complex of 80,000 sq.m. was originally designed specifically to fit the program of Motorola for its headquaters in Israel. The large building is composed of four wings interconnected by a high central atrium. Open-air courts between each wing serve as green recreation areas, Each wing has 8,000 to 12,000  sq.m. office and r+d spaces in 6 floors,  all above 40,000 sq.m. underground and technical laboratory areas, parking and a central power plant.

In retrospect, this design allowed also an efficient Exit Srategy when the original program shrinked and most wings have been occupied by othe users.